HOME ABOUT US PROJECTS NEWS WORKING AT M&P CONTACT US

CIE Tours

The removal and replacement of the heating & Ventilation system at the CIE Tours office was carried out well the staff remained in place on the floor below. The building remained fully operational during the course of the works.

As the plantroom was located on the roof level of a 3 storey building, a crane was required to remove all the old damaged equipment and deliver the new equipment.

Scope of Works:
  • Decommission and remove old AHU & Condenser units
  • Decommission and remove old flue
  • Decommission and remove full heating system & ventilation across 2 floor
  • Supply & Installation of new fully modulating gas fired AHU
  • Supply & Installation of new modulating Condenser unit
  • Supply & Installation of new DW144 ducting system
  • Supply & Installation of new plumbing services
  • Supply & Installation of new gas supply from the basement level to roof level
  • Supply & Installation of new Building Management System

Main Contractor: KN Networks
Mechanical Consultant: Varmings Consulting Engineers
Mechanical Contractor: M&P Mechanical