ABP Foods, Nenagh


New Mechanical Services Installation
The project included:
- The full removal and replacement of the water and heating system with 316 pre insulated stainless steel pipework for steam and hot water.
- Full installation of new boling hall system, and kill floor services.
- 2 number 8 tonne/hr steam boiler were replaced with new and a new 316 stainless steel steam line was installed to the fat plant and packaging areas.
- A 250mm 300mbar gas line was installed around the whole of the plant convert all equipment from heavy oil to natural gas.
- A full design and install was carried out in the amenities area which included
- Heating and cooling ventilation
- Heated lockers for drying clothes over night
- Equipment wash rooms
Client: ABP Foods Nenagh
Main Contractor: ABP Food Group
Mechanical Contractor: M&P Mechanical Services.